Our carpentry team attended a Mayfair office building in order to restore the vanity units in the washrooms that had suffered water damage. They:
- Supplied and installed replacement doors to the:
– 5th,4th,3rd and 2nd female
– 4th , 3rd and 2nd male - replaced Vanity Panel @ 462mm x 462mm on 18mm MR MDF core faced front & rear in Alpi wood veneer laminate 10.97 both sides. Hardwood Oak lipped.
- Concealed all edges with a stain finish as close as possible to laminate colour. Each panel drilled for 3 hinges.
- Supplied and fit new hinges to each door.
RECENT JOBS
Decorating
Our decorating team were asked to attained an office building in order to redecorate one of the communal washrooms.
Wall repair
Our groundworks team attended a commercial office building in Chelsea in order to repair a wall leading to the entrance of the building.
Electric access gate repairs
Our reactive team attended a retail park where the motorised access gates to the service yard were twisting as they opened.
Relaying trip hazards
Our groundworks team attended an industrial site where a health and safety report had indicated that some paving slabs were a potential trip hazard.
Faulty access door
Our reactive maintenance team attended a commercial building. The tenants were having issues accessing the building due to a faulty door.
Decoration and refurbishment
Our decorating team attended a commercial office building north of Oxford Street The team prepared and redecorated a number of washrooms