Our roofing team attended a central London commercial building in order to investigate water ingress. After a thorough investigation it was determined that the water ingress was as a result of the gutter getting blocked and the overflow outlet then being overwhelmed with the heavy rain allowing the water to flow over the back edge of the gutter and into the building.
RECENT JOBS
Installation of bike racks
Our planned maintenance team attended a business park in order to install bike racks to encourage cycling to the workplace.
Pavement repair
Our groundworks team attended a retail park to repair a pavement.
Repair of gas leak
Our reactive gas team attended a commercial building in order to attend a reported gas leak.
Repair of barrier and fence
Repair of barrier and fence in service yard
Replace water pump
Our reactive maintenance team attended a medical centre in order to replace bronze hot water circulator pump and vessel .
Flying response
Our flying response team attended a site in order to provide various accommodation options for birds and bugs who may be visiting.