Our roofing team attended a central London commercial building in order to investigate water ingress. After a thorough investigation it was determined that the water ingress was as a result of the gutter getting blocked and the overflow outlet then being overwhelmed with the heavy rain allowing the water to flow over the back edge of the gutter and into the building.
RECENT JOBS
Office door repair
Our maintenance team were asked to urgently attend a commercial building where the lock had been tampered with, creating a security issue.
Rubbish Clearance
Our reactive maintenance team were happy to attend a retail park to clear rubbish.
Preventing water ingress
Our commercial roofing team attended a Greater London commercial building to prevent water ingress
Fire Stopping
Our planned maintenance team attended a commercial site where a fire risk assessment had identified some weakness in the fire stopping of the basement electrical cupboard.
Paving Replacement
Our groundworks team attended a retail centre due to a potential health and safety hazard.
Entrance door repairs
Our planned maintenance team attended a commercial building in Canary Wharf in order to service double glass doors which had not been operating correctly.