Our roofing team attended a central London commercial building in order to investigate water ingress. After a thorough investigation it was determined that the water ingress was as a result of the gutter getting blocked and the overflow outlet then being overwhelmed with the heavy rain allowing the water to flow over the back edge of the gutter and into the building.
RECENT JOBS
Floor replacement
Floor replacement as part of a refurbishment programme.
Gutter clearance
Our planned maintenance team carried out the quarterly gutter clearance at a commercial premises.
Paving replacement
Our groundworks team attended an office building in response to a health and safety audit.
Installation of barrier and hoop barriers
Our groundworks team attended an industrial site in order to install and test road barrier
Bike shelter construction
Our groundworks team attended a commercial site to install 6m cantilever cycle shelter.
Refurbishment of external areas
Our planned maintenance team attended a commercial property to refurbish some of the outside areas.