Our roofing team attended a central London commercial building in order to investigate water ingress. After a thorough investigation it was determined that the water ingress was as a result of the gutter getting blocked and the overflow outlet then being overwhelmed with the heavy rain allowing the water to flow over the back edge of the gutter and into the building.
RECENT JOBS
Solid Gate
Solid Gate installed at commercial building.
Gate Installation
Installation of security gate with vehicle and pedestrian access at commercial office building.
Bathroom Refurbishment
Refurbishment of commercial bathroom.
Gate Construction
Construction of pedestrian and vehicle gate at commercial building.
Refurbishment of Flat
Flat refurbishment including decorating - boxing in of flue and carpet cleaning.
Carpark Refurbishment
Refresh of car park at commercial building.