Our preventative maintenance team attended a retail centre in response to a Fire Risk Assessment. That assessment had indicated the need for some fire stopping works around electrical penetrations. The team completed using intumescent sealant.

RECENT JOBS

Groundworks

Attended commercial property, lifted slabs causing trip hazards and relayed them on a bed of fresh sharp sand. Removed loose kerb stone and relayed in rapid set concrete, topped with cold lay and bitumen spray.