Our planned maintenance team attended a business park to
-Install new Ecophon ceiling tiles within the toilet area, some tiles to be cut to size.
-Stain block water marks on one column within the office
– Remove all white wall tiles on damaged wall and dispose of
– Install plasterboard to entire wall section
– Tile over plasterboard with white 150×150 white tiles to match existing approx 105.
– Grout the new tiles
RECENT JOBS
Line Marking
Team attended retail park and carried out line marking to the entrance of the car park.
Doors & Access
Attended commercial building to issues regarding front entrance door.
Groundworks
Attended commercial property, lifted slabs causing trip hazards and relayed them on a bed of fresh sharp sand. Removed loose kerb stone and relayed in rapid set concrete, topped with cold lay and bitumen spray.
Commercial Roof Repair
Carried out all repairs required to prevent future leaks.
Fence Repair
Our fencing team attended an industrial centre to repair a fence damaged by reversing lorries.