Our planned maintenance team attended a business park to
-Install new Ecophon ceiling tiles within the toilet area, some tiles to be cut to size.
-Stain block water marks on one column within the office
– Remove all white wall tiles on damaged wall and dispose of
– Install plasterboard to entire wall section
– Tile over plasterboard with white 150×150 white tiles to match existing approx 105.
– Grout the new tiles
RECENT JOBS
Commercial plumbing
Plumber attended a retail site in Derby
Decorating
Our decorating team attended a central London commercial office.
Installation of hand rails in dry riser
Our planned maintenance team attended a commercial building following a FRA in order to: install 3 hand rails from galvanised steel poles fixed into brackets fixed to the wall either side of the riser.
Commercial roof repair
Our commercial roofing team attended an industrial site in order to remove all current lead flashing as it had deteriorated due to amount sitting water.
Decorating
Our decorating team redecorated an internal lobby that had been badly affected by water ingress.
Fire door adjustment
Building fabric team attended a commercial premises in order to attend to a fire door that was unable to close property.