Our planned maintenance team attended a business park to
-Install new Ecophon ceiling tiles within the toilet area, some tiles to be cut to size.
-Stain block water marks on one column within the office
– Remove all white wall tiles on damaged wall and dispose of
– Install plasterboard to entire wall section
– Tile over plasterboard with white 150×150 white tiles to match existing approx 105.
– Grout the new tiles
RECENT JOBS
Fire exit refurbishment
Our planned maintenance team attended a sports complex as the areas around the fire exits needed decorating and refurbishing.
Increased bike rack capacity
Our reactive team installed temporal bike parking in the carpark of a commercial building so that employees could avoid public transport during the corona
Liquid resin treatment for roof
We attended a commercial premises for applying a liquid resin treatment to prevent water ingress.
Internal refurbishment
Our refurbishment team attended a commercial building.
Roof survey
Due to water ingress we carried out a detailed inspection.
Canteen refurbishment
Following a fire risk assessment that identified a hatch that was not fire rated our team attended and removed the hatch and replaced with one that met fire rating standards.