Our planned maintenance team attended a business park to
-Install new Ecophon ceiling tiles within the toilet area, some tiles to be cut to size.
-Stain block water marks on one column within the office
– Remove all white wall tiles on damaged wall and dispose of
– Install plasterboard to entire wall section
– Tile over plasterboard with white 150×150 white tiles to match existing approx 105.
– Grout the new tiles
RECENT JOBS
Christmas tree installation
Our reactive Elves team purchased a number of Christmas trees and decorations for a large commercial building in Cambridge. Trees were then installed and decorated.
Temporary roof repairs
Our roofing team carried out temporary commercial roof repairs to a commercial building prior to more substantive replacement in the next financial year. EPDM and liquid resin were applied.
Decorating and refurbishment
Our decorating team attended and repainted a complete flat for an investment landlord prior to new tenants moving in.
Lock replacement
Our locksmith attended a commercial building in order to replace a lock so that there was a thumb turn on the inside to allow people to exit the building without a key.
Relay paving stones
The groundworks team attended a retail park where damaged paving stones represented a trip hazard and relaid.
Collapsed Manhole Cover
Our groundworks team attended an industrial park in order to repair frame and cover of collapsed manhole highlighted by a health and safety review. .