Our planned maintenance team attended a business park to
-Install new Ecophon ceiling tiles within the toilet area, some tiles to be cut to size.
-Stain block water marks on one column within the office
– Remove all white wall tiles on damaged wall and dispose of
– Install plasterboard to entire wall section
– Tile over plasterboard with white 150×150 white tiles to match existing approx 105.
– Grout the new tiles
RECENT JOBS
New street lights
Electrical installation team fitted 3 new 6 meter street lights in commercial office car park with LEDs. This included groundwork in order to install new electrical cabling for the lights.
Installation palisade fence
Planned maintenance team installed a fabricated palisade fence at an industrial site in order to enhance the security of the site.
Installation Aco drain
Groundworks team installed removed existing damaged drainage channel and installed new ACO drain.
Refurbishment of Fire Escape
As part of a planned maintenance schedule in response to a Fire Risk Assessment we cleaned , applied non slip finish , highlighted nosings, painted fire door and applied D-handle to fire escape and fire exit.
Door Frame Repair
Our carpentry team responded to a reactive maintenance request to repair the door frame of the ladies toilets in an office building.
Fitting of Hand Dryer
Fitting of a new hand dryer in ladies tiles of office as part of a refurbishment.