Our planned maintenance team attended a business park to
-Install new Ecophon ceiling tiles within the toilet area, some tiles to be cut to size.
-Stain block water marks on one column within the office
– Remove all white wall tiles on damaged wall and dispose of
– Install plasterboard to entire wall section
– Tile over plasterboard with white 150×150 white tiles to match existing approx 105.
– Grout the new tiles
RECENT JOBS
Removal of electric entrance barrier
Our reactive team were called to a retail park in order to remove an electric entrance barrier.
Main access door repair
Our team attended as a matter of urgency a commercial building where the main access doors had developed a problem.
Decorating
After a number of leaks our decorating team attended a commercial building to redecorate the staircases and landings. Initially stain block was applied followed by two coats of matt emulsion.
Floor replacement
Our flooring team attended a hospital and replaced corridor flooring. This was done over two weekends so as not to disrupt patients.
Glazing repair
Attended a commercial unit and reglazed a shaped toughened tinted glass double glazed sealed unit with manifestation to match existing
Construction of smoking shelter and associated groundworks
Supplied, delivered and assembled an open fronted smoking shelter