Our planned maintenance team attended a business park to
-Install new Ecophon ceiling tiles within the toilet area, some tiles to be cut to size.
-Stain block water marks on one column within the office
– Remove all white wall tiles on damaged wall and dispose of
– Install plasterboard to entire wall section
– Tile over plasterboard with white 150×150 white tiles to match existing approx 105.
– Grout the new tiles
RECENT JOBS
Repair of ‘Bollard Light’
Having bollards and lights securely fixed prevents vandalism and increased reactive costs.
Tap Replacement
Replacement of tap - we’re happy to help however small the job.
Investigation of water ingress
Often blocked gutters can cause significant problems, these can be avoided by performing regular gutter clearance.
Decoration of Stairwell
Decoration of stairwell.
Earth Works
Is your site secure from unwanted visitors? The construction of a trench to prevent unauthorised caravans/vehicles from entering.
Ensuring Christmas Happens
Visited site to ensure that all Christmas light sockets were operational!