Our groundworks team attended a commercial site to install 6m cantilever cycle shelter. Lifted 3 areas of block paving and dug holes to depth specified by shelter manufacturers, installed uprights and concreted in and then re-set the block paving.
RECENT JOBS
Line Marking
Team attended retail park and carried out line marking to the entrance of the car park.
Doors & Access
Attended commercial building to issues regarding front entrance door.
Groundworks
Attended commercial property, lifted slabs causing trip hazards and relayed them on a bed of fresh sharp sand. Removed loose kerb stone and relayed in rapid set concrete, topped with cold lay and bitumen spray.
Commercial Roof Repair
Carried out all repairs required to prevent future leaks.
Fence Repair
Our fencing team attended an industrial centre to repair a fence damaged by reversing lorries.