Our groundworks team attended an office centre after a number of heavy goods vehicles had damaged the block paving. They lifted sunken block paving. Filled sunken area with sand and ballast to bring the level up. Cleaned all paviours and reset. Swept in kiln dried sand.
RECENT JOBS
Mold treatment & redecoration for retail unit
Our team attended retail unit that had been effected by mould and staining and redecorated.
Boiler Installation
Our plumbing and heating team attended a retail premises in order to install a boiler
Replacement of entry barrier
Our team urgently attended an industrial site due to a broken entrance barrier
Installation of fire exit
A 2 man team removed the existing structure to create a new fire exit.
Laying of new floor
Our carpet fitters attended a commercial site to lay a new floor
Installation of knee rail fencing
Our carpentry team attended a retail park in order to install a wooden knee fence to prevent footfall through a ’shortcut’ with potential health and safety consequences.