Our plumbing and heating team attended a retail premises in order to
Decommission and remove the existing boiler – remove the existing flue – supply and fit x1 24kw combi boiler
Supply and run x1 horizontal flue terminating outside ( next to the window ) terminating outside
Supply and apply system inhibitor
Supply and fit x1 thermostat
Dispose old boiler to regulation
Fill up the system and test everything is working okay and show site contact exactly how the system works
RECENT JOBS
Redecoration
Our planned maintenance team attended a premier Mayfair office - repainted all walls and ceilings in common areas out of hours.
Clearing blocked gutters and downpipes
Our reactive maintenance team attended a commercial site where the bike store was suffering water ingress from a flooded roof due to the gutters and downpipes being blocked.
Sealing of flat roof above lift shaft
Our planned maintenance team attended a commercial building in order to service and seal a flat roof above a 10 story lift shaft to ensure that there would be no water ingress in to the lift shaft and thus preventing any future issues with the lift and its mechanical parts
Installation of access hatches
Our planned maintenance team attended a site in Canary Wharf and installed 4 * access hatched into the rear of kitchen cupboards to facilitate easy access to utilities
New post and sign
Our planned maintenance team attended an industrial site and installed a new standing post and 15mph speed sign as a health and safety measure.
Replacement of damaged safety barrier
Our planned maintenance team team attended an industrial site in order to repair a damaged safety barrier which was a potential health and safety risk.