Our plumbing and heating team attended a retail premises in order to
Decommission and remove the existing boiler – remove the existing flue – supply and fit x1 24kw combi boiler
Supply and run x1 horizontal flue terminating outside ( next to the window ) terminating outside
Supply and apply system inhibitor
Supply and fit x1 thermostat
Dispose old boiler to regulation
Fill up the system and test everything is working okay and show site contact exactly how the system works
RECENT JOBS
Freddy the falcon
Seagulls were creating a health and safety issue at an industrial site.
Lobby decoration
Our decorating team attended a commercial premises in order to decorate the citing and stairwells of the large lobby area.
Light repair in car park
Our electrical team attended site and isolated electrical supply to light fittings.
EICR wiring certificate
Our electrical team attended site in order to test and provide an EICR on 3 36 way 3 phase distribution boards.
Palisade fence repairs at industrial site
Our reactive maintenance team for repair works carried out to palisade gates to the front of unit of 4 adjusting gates to allow locking eyes to line up.
Decoration of residential flat
Our decorating team attended site in order to redecorate all walls of a residential flat following a change of tenancy.