Our plumbing and heating team attended a retail premises in order to
Decommission and remove the existing boiler – remove the existing flue – supply and fit x1 24kw combi boiler
Supply and run x1 horizontal flue terminating outside ( next to the window ) terminating outside
Supply and apply system inhibitor
Supply and fit x1 thermostat
Dispose old boiler to regulation
Fill up the system and test everything is working okay and show site contact exactly how the system works
RECENT JOBS
Pavement repair
Our groundworks team attended a retail park to repair a pavement.
Repair of gas leak
Our reactive gas team attended a commercial building in order to attend a reported gas leak.
Repair of barrier and fence
Repair of barrier and fence in service yard
Replace water pump
Our reactive maintenance team attended a medical centre in order to replace bronze hot water circulator pump and vessel .
Flying response
Our flying response team attended a site in order to provide various accommodation options for birds and bugs who may be visiting.
Railing installation
Our preventative maintenance team attended a commercial premises in order to install a hand rail, the absence of which had been noted in a recent Health and Safety audit.