Our plumbing and heating team attended a retail premises in order to
Decommission and remove the existing boiler – remove the existing flue – supply and fit x1 24kw combi boiler
Supply and run x1 horizontal flue terminating outside ( next to the window ) terminating outside
Supply and apply system inhibitor
Supply and fit x1 thermostat
Dispose old boiler to regulation
Fill up the system and test everything is working okay and show site contact exactly how the system works
RECENT JOBS
Drain repair
Our reactive team attended a retail park in order to replace a water meter cover that was a potential health and safety risk.
Decorating
Our decorating team were asked to attained an office building in order to redecorate one of the communal washrooms.
Wall repair
Our groundworks team attended a commercial office building in Chelsea in order to repair a wall leading to the entrance of the building.
Electric access gate repairs
Our reactive team attended a retail park where the motorised access gates to the service yard were twisting as they opened.
Relaying trip hazards
Our groundworks team attended an industrial site where a health and safety report had indicated that some paving slabs were a potential trip hazard.
Faulty access door
Our reactive maintenance team attended a commercial building. The tenants were having issues accessing the building due to a faulty door.