Our planned maintenance team attended a commercial premises and supplied and applied Thermoplastic road line material in accordance with EN 1871 to form markings.
Markings included.
Single and Double arrows
Central road lines
3x Junctions
Lettering in the Visitors parking area
Entire line along the top of the main car park covering bays and junctions out of each row
RECENT JOBS
Fence Repair
Repair of fence that was presenting a health and safety hazard.
Liquid resin treatment
Liquid resin treatment to fascia and gutter
Electrical Repair of Entrance Control
Reactive maintenance to repair entrance control to office car park to ensure no security problems.
Installation of Protective Bollards
Planned maintenance work to install parking bollards to act as a safety barrier to prevent health and safety risk to pedestrians.
Painting of Hoarding Board
Painting of a security hoarding
Replacement of Flat Roof
Replacement of flat commercial roof as part of a preventative maintenance programme