Our reactive maintenance team, in response to a Fire Risk Assessment, attended an industrial site in order to sweep both fire escapes to clear all litter and leaves, remove all large rubbish from 2 fire escapes. Using a strimmer they cut down all over grown weeds and removed all waste from site.
RECENT JOBS
Line Marking
Team attended retail park and carried out line marking to the entrance of the car park.
Doors & Access
Attended commercial building to issues regarding front entrance door.
Groundworks
Attended commercial property, lifted slabs causing trip hazards and relayed them on a bed of fresh sharp sand. Removed loose kerb stone and relayed in rapid set concrete, topped with cold lay and bitumen spray.
Commercial Roof Repair
Carried out all repairs required to prevent future leaks.
Fence Repair
Our fencing team attended an industrial centre to repair a fence damaged by reversing lorries.