Planned maintenance in response to health and safety review. Cleaning of a pontoon and a walkway of moss and green algae which presented a trip hazard ensuring that both the wooden pathway and metal walk plates were clear of any residue.

RECENT JOBS

Groundworks

Attended commercial property, lifted slabs causing trip hazards and relayed them on a bed of fresh sharp sand. Removed loose kerb stone and relayed in rapid set concrete, topped with cold lay and bitumen spray.

2019-07-22T14:13:36+02:00
Go to Top