Our commercial roofing team attended an industrial site in order to remove all current lead flashing as it had deteriorated due to amount sitting water.
Cut out new chase for new leadwork to be installed.
Install new 12 inch leadwork into parapet all leadwork pointed with lead sealant.
Parapet dried out and new rubber waterproof coating to be applied to entire parapet.
New mesh ball installed over down pipe to prevent debris from blocking down pipe again.
RECENT JOBS
‘One stop shop’ – Health and safety – roofing – electrics – decorating
Our multi skilled team attended a commercial premises in order to fulfil a number of ‘handyman’ jobs in one visit highlighted in a health and safety assessment and tenant.
Fire escape route clearance
Attended site in order to sweep both fire escapes on both sides of the building to clear all litter and leaves
Line Marking
Our team attended an office park in order to apply thermostatic road markings
Electrical inspection and repair of external lighting
Our electrical team attended an industrial park in order to inspect and repair as necessary the external lighting.
Leak repair
Our reactive maintenance team attended a commercial centre in order to investigate and solve a water ingress issue
Vanity unit refurbishment
Our carpentry team attended a Mayfair office building in order to restore the vanity units in the washrooms that had suffered water damage.