Our commercial roofing team attended an industrial site in order to remove all current lead flashing as it had deteriorated due to amount sitting water.
Cut out new chase for new leadwork to be installed.
Install new 12 inch leadwork into parapet all leadwork pointed with lead sealant.
Parapet dried out and new rubber waterproof coating to be applied to entire parapet.
New mesh ball installed over down pipe to prevent debris from blocking down pipe again.
RECENT JOBS
Electrical Installation
Our electrical team attended a central London commercial building for an installation.
Removal of fly tipping
Our waste removal team attended a retail park where there had been a significant amount of fly tipping.
Replacement of broken glass panel
Our glazing team attended a commercial centre and removed a damaged glass pane and replaced.
New post fabrication and removal of CCTV
Our electrical and groundworks teams attended an industrial site in order to remove a damaged post that had been hit by an HGV.
Installation of LED lights
Our commercial electrical team attended an industrial estate in order to new LED lighting.
Levelling of slabs at entrance
Our planned maintenance team attended a business park in order to address a potential health and safety hazard caused by uneven slabs.