Reactive maintenance to ensure that security isn’t compromised due to frame coming away from external door. The door frame headers had been loosely refitted. The side door was particularly loose – we removed each of the header plates (3 doors) and secured each of them to the framework with stainless steel screws – the doors are still able to be maintained simply by unscrewing the header plate securing screws
RECENT JOBS
Drain repair
Our reactive team attended a retail park in order to replace a water meter cover that was a potential health and safety risk.
Decorating
Our decorating team were asked to attained an office building in order to redecorate one of the communal washrooms.
Wall repair
Our groundworks team attended a commercial office building in Chelsea in order to repair a wall leading to the entrance of the building.
Electric access gate repairs
Our reactive team attended a retail park where the motorised access gates to the service yard were twisting as they opened.
Relaying trip hazards
Our groundworks team attended an industrial site where a health and safety report had indicated that some paving slabs were a potential trip hazard.
Faulty access door
Our reactive maintenance team attended a commercial building. The tenants were having issues accessing the building due to a faulty door.