Our reactive maintenance team attended a retail park due to lighting fault. They traced wiring back to distribution board and isolated supply, removed defective light fittings and fitted new led units altered wiring to enable switch to operate.
RECENT JOBS
Fence Repair
Repair of fence that was presenting a health and safety hazard.
Liquid resin treatment
Liquid resin treatment to fascia and gutter
Electrical Repair of Entrance Control
Reactive maintenance to repair entrance control to office car park to ensure no security problems.
Installation of Protective Bollards
Planned maintenance work to install parking bollards to act as a safety barrier to prevent health and safety risk to pedestrians.
Painting of Hoarding Board
Painting of a security hoarding
Replacement of Flat Roof
Replacement of flat commercial roof as part of a preventative maintenance programme