Our reactive maintenance team attended a central London office to
– Remove slabs that were broken at the entrance
– Dig out area where slabs have been removed and prepare for new slabs to be laid in place.
– Lay new slabs on a bed of mortar where old slabs have been removed.
– Point all joints with mortar.
RECENT JOBS
Install wooden ramp
Our carpentry team attended an industrial site in oder to replace a widen ramp that had been highlighted in a health and safety review.
Fire stopping
Fire stopping / fire door team attended a commercial office building.
Bollar refurbishment
Our decorating team attended an industrial park in order to refurbish 36 bollards - a mix of metal and concrete.
Drain repair
Our reactive team attended a retail park in order to replace a water meter cover that was a potential health and safety risk.
Decorating
Our decorating team were asked to attained an office building in order to redecorate one of the communal washrooms.