Our reactive maintenance team attended a commercial building. The tenants were having issues accessing the building due to a faulty door. The team removed the doors. Lifted threshold and broke out broken pivot bases. Fitted new bases to floor and resecured threshold strip. Changed pivot bearings on both doors. Rehung doors and adjusted to ensure correct closing.
RECENT JOBS
Install wooden ramp
Our carpentry team attended an industrial site in oder to replace a widen ramp that had been highlighted in a health and safety review.
Fire stopping
Fire stopping / fire door team attended a commercial office building.
Bollar refurbishment
Our decorating team attended an industrial park in order to refurbish 36 bollards - a mix of metal and concrete.
Drain repair
Our reactive team attended a retail park in order to replace a water meter cover that was a potential health and safety risk.
Decorating
Our decorating team were asked to attained an office building in order to redecorate one of the communal washrooms.