Our reactive maintenance team attended a West End office building in order to replace a fire door. Door included a full glazed door panel with 11.4mm clear pyro guard to achieve a 60/0 integrity only fire rating with an acid etched film on the glass.

RECENT JOBS

Groundworks

Attended commercial property, lifted slabs causing trip hazards and relayed them on a bed of fresh sharp sand. Removed loose kerb stone and relayed in rapid set concrete, topped with cold lay and bitumen spray.