Our preventative maintenance team attended a retail centre in response to a Fire Risk Assessment. That assessment had indicated the need for a replacement fire door. The team removed the old door and added intumescent strips and fire rated hinges.
RECENT JOBS
Street lighting repair
Our reactive maintenance team attended an industrial site to repair street lighting
Bike Shelter
Assemble and Install a gated bike shelter to encourage sustainability
Entrance Repair
Our reactive maintenance team attended a commercial office to repair the entrance
Speed bumps
Our reactive team attended a leisure complex to install new speed bumps
Paint edging
Our planned maintenance team attended an office building in response to a health and safety report.
Bathroom refurbishment
Our planned maintenance team attended a business park for a bathroom refurbishment
Load More Posts