Our preventative maintenance team attended a retail centre in response to a Fire Risk Assessment. That assessment had indicated the need for a replacement fire door. The team removed the old door and added intumescent strips and fire rated hinges.
RECENT JOBS
Electrical repair
Our reactive maintenance team attended a retail park due to lighting fault.
Street lighting repair
Our reactive maintenance team attended an industrial site to repair street lighting
Bike Shelter
Assemble and Install a gated bike shelter to encourage sustainability
Entrance Repair
Our reactive maintenance team attended a commercial office to repair the entrance
Speed bumps
Our reactive team attended a leisure complex to install new speed bumps
Paint edging
Our planned maintenance team attended an office building in response to a health and safety report.