Our preventative maintenance team attended a retail centre in response to a Fire Risk Assessment. That assessment had indicated the need for a replacement fire door. The team removed the old door and added intumescent strips and fire rated hinges.
RECENT JOBS
Fire extinguisher installations
In response to a Fire risk Assessment our reactive maintenance team attended an industrial complex. They installed fire extinguishers and suitable signage through out the unit.
Hand sanitiser station
Or reactive team visited a commercial office in order to supply and instal a hand sanitiser station to ensure that the site complied with the Health and Safety guidance to combat the corona.
Signage to ensure building corona ready
Our reactive team attend a client site and fixed signage throughout the building to ensure compliance with all health and safety requirements prior to the premises being reoccupied post corona.
Corona Ready Office
Our reactive team visited a commercial office to install star signage, lift signage, screens and sanitiser stations.
Refurbishment of retail premises
Our refurbishment team attended a retail premises that was closed due to the corona.
Refurbishment
Our refurbishment team team attended a commercial premises to take advantage of the areas being quiet during the corona lock down period