Attended site in order to sweep both fire escapes on both sides of the building to clear all litter and leaves -remove large debris/rubbish from the fire escapes and cut down any over grown weeds. Remove all waste from site.Report any further issues or damage on both fire escapes
RECENT JOBS
Bollard Installation
Installation of bollard to protect pavement.
Height Restrictor
Repair of height restrictor.
Drone Survey
Drone survey of residential flat roof to check for source of water ingress.
Installation of steel mesh
Installation of steel mesh - Are your fire exits secure from unauthorised access?
Relaying of Roof to Prevent Water Ingress
Sometimes the original design of a roof can be altered at little cost compared to a new roof to mitigate water ingress.
Temporary Liquid Resin Treatment
The application of liquid resin to areas suffering water ingress can be an efficient and cost effective approach pending more substantial investment.