Fire stopping / fire door team attended a commercial office building. Fire stopping installed to the vertical services penetrations.
Installation of the intumescent strip – 15 mm white brush and adjustment to the door to achieve correct gaps and soft closing.
We will provide a Certificate of Conformity for compliant Passive Fire Protection works completed to manufacturers’ tests & installation methods if fire strategy drawings are provided or if building owner confirms the fire rating of all fire compartments in the absence of fire strategy drawings.
RECENT JOBS
Paint edging
Our planned maintenance team attended an office building in response to a health and safety report.
Bathroom refurbishment
Our planned maintenance team attended a business park for a bathroom refurbishment
Repaint edging of steps
Our preventative maintenance team attended a retail park in response to an issue raised in a health and safety review.
Graffiti removal
Our reactive maintenance team attended a business park in order to remove offensive graffiti and potential liable against ‘Jimmy ‘.
Repair of raised paving
Repair of raised paving
Reconstruction of fence
Our reactive team attended in order to repair a defective fence.