Our reactive maintenance team attended an industrial unit due to a damaged gate.
Cut out damaged sections of metal on the gate and grind off old weld from gate stiles.
Supply and weld in 3 new 65mmx12mm sections.
Paint with external black metal paint
RECENT JOBS
Install wooden ramp
Our carpentry team attended an industrial site in oder to replace a widen ramp that had been highlighted in a health and safety review.
Fire stopping
Fire stopping / fire door team attended a commercial office building.
Bollar refurbishment
Our decorating team attended an industrial park in order to refurbish 36 bollards - a mix of metal and concrete.
Drain repair
Our reactive team attended a retail park in order to replace a water meter cover that was a potential health and safety risk.
Decorating
Our decorating team were asked to attained an office building in order to redecorate one of the communal washrooms.