Planned maintenance at industrial park including groundworks, line marking and signage. Dug out and removed kerb stones on either side of the road Installed new dropped kerb stones
Dug out pavement and installed tactile paving slabs sloping down towards road on each side, erected 4x 3m galvanised steel sign post and installed 2x pedestrian crossing signs and 2x warning pedestrian crossing signs to new posts.
Finally a pedestrian crossing across the road was marked out.
RECENT JOBS
Levelling of slabs at entrance
Our planned maintenance team attended a business park in order to address a potential health and safety hazard caused by uneven slabs.
Signage Installation
Our planned maintenance team attended a commercial centre and installed a a dead end sign at the entrance of the complex.
Interior Decoration
Our refurbishment team attended a commercial office building to carry out redecoration whilst the office had low volume due to home working.
Picnic facilities
Our reactive maintenance team attended a commercial premises in order to urgently install a picnic table so that people were able to take advantage of the weather.
Replacement of kerbs stones and paving slabs
Our planned maintenance team went to an industrial park to break out damaged 3 kerb stones and 2 paving slabs that were a potential health and safety hazard...
Fabrication and replacement of swing gate
Our planned maintenance team attended an industrial centre for fabrication and replacement of a swing gate