Planned maintenance at industrial park including groundworks, line marking and signage. Dug out and removed kerb stones on either side of the road Installed new dropped kerb stones
Dug out pavement and installed tactile paving slabs sloping down towards road on each side, erected 4x 3m galvanised steel sign post and installed 2x pedestrian crossing signs and 2x warning pedestrian crossing signs to new posts.
Finally a pedestrian crossing across the road was marked out.
RECENT JOBS
Flying response
Our flying response team attended a site in order to provide various accommodation options for birds and bugs who may be visiting.
Railing installation
Our preventative maintenance team attended a commercial premises in order to install a hand rail, the absence of which had been noted in a recent Health and Safety audit.
Electrical repair
Our reactive maintenance team attended a retail park due to lighting fault.
Street lighting repair
Our reactive maintenance team attended an industrial site to repair street lighting
Bike Shelter
Assemble and Install a gated bike shelter to encourage sustainability
Entrance Repair
Our reactive maintenance team attended a commercial office to repair the entrance