Our groundworks team attended site – lifted areas of dropped and risen block paving that had created a trip hazard in the car park at either side of the building. Cleaned out base and using sharp sand reset blocks back into place. Sweeped in kiln sand to secure blocks into place.
RECENT JOBS
Railing installation
Our preventative maintenance team attended a commercial premises in order to install a hand rail, the absence of which had been noted in a recent Health and Safety audit.
Electrical repair
Our reactive maintenance team attended a retail park due to lighting fault.
Street lighting repair
Our reactive maintenance team attended an industrial site to repair street lighting
Bike Shelter
Assemble and Install a gated bike shelter to encourage sustainability
Entrance Repair
Our reactive maintenance team attended a commercial office to repair the entrance
Speed bumps
Our reactive team attended a leisure complex to install new speed bumps