Our groundworks team attended site – lifted areas of dropped and risen block paving that had created a trip hazard in the car park at either side of the building. Cleaned out base and using sharp sand reset blocks back into place. Sweeped in kiln sand to secure blocks into place.
RECENT JOBS
Mold treatment & redecoration for retail unit
Our team attended retail unit that had been effected by mould and staining and redecorated.
Boiler Installation
Our plumbing and heating team attended a retail premises in order to install a boiler
Replacement of entry barrier
Our team urgently attended an industrial site due to a broken entrance barrier
Installation of fire exit
A 2 man team removed the existing structure to create a new fire exit.
Laying of new floor
Our carpet fitters attended a commercial site to lay a new floor
Installation of knee rail fencing
Our carpentry team attended a retail park in order to install a wooden knee fence to prevent footfall through a ’shortcut’ with potential health and safety consequences.