Planned maintenance including groundworks, signage and drains. Replaced broken/missing traffic bollard at entrance to site with 1no left arrow directional rebound bollard and Removed the old fixing from the ground
Removed old posts outside DFS and installed 2 Drexus 100 drainage C250 drain covers to drainage channel outside DFS
RECENT JOBS
Roof repair
Our reactive maintenance team attended a commercial property in order to repair a flat roof after water ingress and been noticed.
Step nosing
Our planned maintenance team attended a commercial site in order to highlight a potential hazard identified by a health and safety report.
Manhole repair
Our planned maintenance team attended an industrial park in order to repair a damaged manhole frame.
Removal of graffiti
Our reactive maintenance team attended a commercial premises to remove graffiti that had little artistic merit.
Light installation
Our planned maintenance team attended an industrial centre to Install 3 PIR sensor lights
Bracket replacement for screens shielding car park
Our planned maintenance team attended a car park at a commercial centre in order to replace the brackets holding in place the shielding screens for the multi storey car park.