Planned maintenance including groundworks, signage and drains. Replaced broken/missing traffic bollard at entrance to site with 1no left arrow directional rebound bollard and Removed the old fixing from the ground
Removed old posts outside DFS and installed 2 Drexus 100 drainage C250 drain covers to drainage channel outside DFS
RECENT JOBS
Line Marking
Line marking team attended site to a London based office block to reline the car park and add additional green parking bays.
Decorating
Decorating team attended office building.
Line Marking
Line marking team attended office car park. Supplied and applied thermoplastic on tarmac.
Groundworks
Groundworks team attended site and repaired broken kerbs and pavement slabs.
Groundworks – Health & Safety
Groundworks team attended retail park. Cut out tarmac ready for new tarmac to be laid. Re-laid tarmac to fill potholes.