Planned maintenance including groundworks, signage and drains. Replaced broken/missing traffic bollard at entrance to site with 1no left arrow directional rebound bollard and Removed the old fixing from the ground
Removed old posts outside DFS and installed 2 Drexus 100 drainage C250 drain covers to drainage channel outside DFS

RECENT JOBS

Groundworks

Groundworks team attended retail park in Peterborough to replace aco drain and channel. Broke out existing drain and channel and supplied and fitted new.

Groundworks

Groundwork team attended commercial car park to reset corner stone. Cleaned all old mortar from stone and cleaned base. Reset with new mortar.

Electrical

Electrician attended site and gained access to distribution board and found breaker had tripped. Reset breaker and checked lights.

2022-02-14T18:49:41+02:00