Planned maintenance including groundworks, signage and drains. Replaced broken/missing traffic bollard at entrance to site with 1no left arrow directional rebound bollard and Removed the old fixing from the ground
Removed old posts outside DFS and installed 2 Drexus 100 drainage C250 drain covers to drainage channel outside DFS
RECENT JOBS
Railing installation
Our preventative maintenance team attended a commercial premises in order to install a hand rail, the absence of which had been noted in a recent Health and Safety audit.
Electrical repair
Our reactive maintenance team attended a retail park due to lighting fault.
Street lighting repair
Our reactive maintenance team attended an industrial site to repair street lighting
Bike Shelter
Assemble and Install a gated bike shelter to encourage sustainability
Entrance Repair
Our reactive maintenance team attended a commercial office to repair the entrance
Speed bumps
Our reactive team attended a leisure complex to install new speed bumps