Planned maintenance including groundworks, signage and drains. Replaced broken/missing traffic bollard at entrance to site with 1no left arrow directional rebound bollard and Removed the old fixing from the ground
Removed old posts outside DFS and installed 2 Drexus 100 drainage C250 drain covers to drainage channel outside DFS
RECENT JOBS
Office door repair
Our maintenance team were asked to urgently attend a commercial building where the lock had been tampered with, creating a security issue.
Rubbish Clearance
Our reactive maintenance team were happy to attend a retail park to clear rubbish.
Preventing water ingress
Our commercial roofing team attended a Greater London commercial building to prevent water ingress
Fire Stopping
Our planned maintenance team attended a commercial site where a fire risk assessment had identified some weakness in the fire stopping of the basement electrical cupboard.
Paving Replacement
Our groundworks team attended a retail centre due to a potential health and safety hazard.
Entrance door repairs
Our planned maintenance team attended a commercial building in Canary Wharf in order to service double glass doors which had not been operating correctly.