Planned maintenance including groundworks, signage and drains. Replaced broken/missing traffic bollard at entrance to site with 1no left arrow directional rebound bollard and Removed the old fixing from the ground
Removed old posts outside DFS and installed 2 Drexus 100 drainage C250 drain covers to drainage channel outside DFS
RECENT JOBS
Decorating
Planned maintenance to decorate the lobby area of an office due to wear and tear.
Maintenance of conservatory roof glazing
Planned maintenance of conservatory roof glazing at an office
Refurbishment of office lavatories
Planned maintenance - Refurbishment of toilets in office due to rising damp.
Commercial Plumbing
Reactive maintenance response to blocked sinks in ladies bathroom.
Shower Glazing
Replacement of shower glazing in commercial building as part of reactive maintenance response for the client facilities manger.