Planned maintenance including groundworks, signage and drains. Replaced broken/missing traffic bollard at entrance to site with 1no left arrow directional rebound bollard and Removed the old fixing from the ground
Removed old posts outside DFS and installed 2 Drexus 100 drainage C250 drain covers to drainage channel outside DFS
RECENT JOBS
Install wooden ramp
Our carpentry team attended an industrial site in oder to replace a widen ramp that had been highlighted in a health and safety review.
Fire stopping
Fire stopping / fire door team attended a commercial office building.
Bollar refurbishment
Our decorating team attended an industrial park in order to refurbish 36 bollards - a mix of metal and concrete.
Drain repair
Our reactive team attended a retail park in order to replace a water meter cover that was a potential health and safety risk.
Decorating
Our decorating team were asked to attained an office building in order to redecorate one of the communal washrooms.