Planned maintenance in response to a health and safety survey. Supplied and installed galvanised handrail to stop fall hazard next to roof access ladder as well galvanised handrail to extend existing handrail to extend height along front edge of roof area.
RECENT JOBS
Commercial plumbing
Plumber attended a retail site in Derby
Decorating
Our decorating team attended a central London commercial office.
Installation of hand rails in dry riser
Our planned maintenance team attended a commercial building following a FRA in order to: install 3 hand rails from galvanised steel poles fixed into brackets fixed to the wall either side of the riser.
Commercial roof repair
Our commercial roofing team attended an industrial site in order to remove all current lead flashing as it had deteriorated due to amount sitting water.
Decorating
Our decorating team redecorated an internal lobby that had been badly affected by water ingress.
Fire door adjustment
Building fabric team attended a commercial premises in order to attend to a fire door that was unable to close property.