Planned maintenance in response to a health and safety survey. Supplied and installed galvanised handrail to stop fall hazard next to roof access ladder as well galvanised handrail to extend existing handrail to extend height along front edge of roof area.
RECENT JOBS
Roof survey
Due to water ingress we carried out a detailed inspection.
Canteen refurbishment
Following a fire risk assessment that identified a hatch that was not fire rated our team attended and removed the hatch and replaced with one that met fire rating standards.
Drainage channel replacement
Our groundworks team attended a commercial premises.
Lock Change
Our reactive maintenance team attended a commercial premises due to a broken lock preventing access.
Canteen refurbishment
Our refurbishment team attended the canteen of a commercial premises.
Damaged wall due to plant growth
Our reactive maintenance team attended a commercial premises where there was plant growth damaging a rear wall.