A 2 man team to attended site to carry out the following:
Remove existing doors and frame.
Supply, construct and install a new timber frame.
Supply and fit solid core double doors into new frame with new hinges.
Install double door panic bar set on the inside of the new doors.
Supply and fit an outside access mechanical code lock
Doors to be primed and painted black
Test operation of doors
RECENT JOBS
Electrical
Electrician attended commercial building to find no power supply to led light fixture.
Line Marking
Team attended retail park and carried out line marking to the entrance of the car park.
Doors & Access
Attended commercial building to issues regarding front entrance door.
Groundworks
Attended commercial property, lifted slabs causing trip hazards and relayed them on a bed of fresh sharp sand. Removed loose kerb stone and relayed in rapid set concrete, topped with cold lay and bitumen spray.
Commercial Roof Repair
Carried out all repairs required to prevent future leaks.