A 2 man team to attended site to carry out the following:
Remove existing doors and frame.
Supply, construct and install a new timber frame.
Supply and fit solid core double doors into new frame with new hinges.
Install double door panic bar set on the inside of the new doors.
Supply and fit an outside access mechanical code lock
Doors to be primed and painted black
Test operation of doors
RECENT JOBS
Gate repairs
Our reactive maintenance team attended an industrial unit due to a damaged gate.
Gutter and roof clearance
Our preventative maintenance team attended an industrial site in order to clear out roof gutters and flush downpipes in order to prevent any future water ingress
Decorating
Our decorating team attended a retail outlet in order to repair an area of water ingress.
Refurbishment following water ingress
Our decorating team attended a student accommodation block following a water leak
Gutter and downpipes clearance
Our guttering team attended a retail centre and insured that all downpipes were cleared and flushed