A 2 man team to attended site to carry out the following:
Remove existing doors and frame.
Supply, construct and install a new timber frame.
Supply and fit solid core double doors into new frame with new hinges.
Install double door panic bar set on the inside of the new doors.
Supply and fit an outside access mechanical code lock
Doors to be primed and painted black
Test operation of doors
RECENT JOBS
Liquid resin treatment for roof
We attended a commercial premises for applying a liquid resin treatment to prevent water ingress.
Internal refurbishment
Our refurbishment team attended a commercial building.
Roof survey
Due to water ingress we carried out a detailed inspection.
Canteen refurbishment
Following a fire risk assessment that identified a hatch that was not fire rated our team attended and removed the hatch and replaced with one that met fire rating standards.
Drainage channel replacement
Our groundworks team attended a commercial premises.
Lock Change
Our reactive maintenance team attended a commercial premises due to a broken lock preventing access.